Open Access
Table III
Summary of different therapeutic strategies to rectify oral impairments of cleidocranial dysplasia in the literature.
Strategy | Intervention age | Intervention type | Reference |
---|---|---|---|
Toronto–Melbourne | 5-6 years | Extraction of the temporary incisors | [6,7] |
6-7 years | Creation of anterior mucoperiosteal flaps to uncover permanent incisors and fixation of brackets for orthodontic traction; Extraction of temporary molars | ||
9–12 years | Creation of posterior flaps to uncover permanent canines and premolars and fixation of brackets for orthodontic traction; Extraction of supernumerary teeth |
||
Jerusalem | 10–12 years | Extraction of anterior temporary teeth Extraction of supernumerary teeth Creation of anterior mucoperiosteal flaps and fixation of brackets on permanent incisors for orthodontic traction |
[3,4] |
13 years and older | Extraction of posterior temporary teeth; Creation of posterior flaps and fixation of brackets on canines and permanent premolars for orthodontic traction |
||
Belfast–Hamburg | Non-specific age | Only one procedure: Extraction of temporary teeth and supernumerary teeth; Creation of anterior and posterior flaps to expose the permanent teeth; Implementation of regularly renewed surgical “packs” that allow second-line healing; Fixation of brackets to permanent teeth when accessible. | [1] |
The Bronx | Non-specific age | First procedure: Avulsion of all supernumerary teeth; Second procedure: Creation of anterior and posterior flaps and fixation of brackets on permanent incisors for orthodontic traction; Installation of removable prostheses for temporization over the arches; Third procedure (if necessary): Conduct osteotomies and implant placement |
[8] |
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.